{"id":136,"date":"2021-07-12T08:00:00","date_gmt":"2021-07-12T08:00:00","guid":{"rendered":"https:\/\/sussex-transport.net\/?p=136"},"modified":"2021-07-24T19:26:10","modified_gmt":"2021-07-24T19:26:10","slug":"a22-a2290-junction-improvements-put-to-consultation","status":"publish","type":"post","link":"https:\/\/sussex-transport.net\/index.php\/2021\/07\/12\/a22-a2290-junction-improvements-put-to-consultation\/","title":{"rendered":"A22 &#038; A2290 Junction Improvements put to consultation"},"content":{"rendered":"\n<p>Between the 12th July and 20th August, ESCC are putting various improvements for the A22 &amp; A2290 to consultation. In total there are 9 junctions.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Boship Roundabout<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"723\" src=\"https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-44-1024x723.png\" alt=\"\" class=\"wp-image-139\" srcset=\"https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-44-1024x723.png 1024w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-44-300x212.png 300w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-44-768x542.png 768w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-44.png 1159w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>At the Northern end of the Hailsham Bypass, it is proposed to add traffic signals to the roundabout, along with some carriageway widening to allow stacking and NMU improvements including a Toucan Crossing provided at the Dual Carriageway. The access to Boship Lions Farm Hotel <br>would also be traffic signal controlled.<\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Hempstead Lane Junction<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"723\" src=\"https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-45-1024x723.png\" alt=\"\" class=\"wp-image-140\" srcset=\"https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-45-1024x723.png 1024w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-45-300x212.png 300w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-45-768x542.png 768w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-45.png 1157w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Currently this is an at-grade T junction. All left turn movements are provided and only 1 right turn movement is provided. The proposed change would be to introduce a roundabout here with a toucan crossing on the southern side, allowing safer NMU access via Hempstead Lane.<\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Eagles Roundabout<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"725\" src=\"https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-46-1024x725.png\" alt=\"\" class=\"wp-image-141\" srcset=\"https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-46-1024x725.png 1024w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-46-300x213.png 300w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-46-768x544.png 768w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-46.png 1156w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>This roundabout would receive minor improvements of additional lanes (2-&gt;3) on the A22 approaches, as well as the A295 getting a roundabout bypass heading south. A toucan crossing would also be provided across the Northern Arm.<\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Golden Jubilee Roundabout<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"722\" src=\"https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-47-1024x722.png\" alt=\"\" class=\"wp-image-142\" srcset=\"https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-47-1024x722.png 1024w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-47-300x212.png 300w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-47-768x542.png 768w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-47.png 1157w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>The A27\/A22 roundabout would receive and additional lane, and a new footway on the Eastern side linking to a PRoW. The roundabout between the A22 and B2247 (old A27) would be replaced with a traffic signal controlled crossroads. Toucan crossings would be provided on 4 of the arms and all approaches would be widened.<\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Shinewater Roundabout<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"722\" src=\"https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-48-1024x722.png\" alt=\"\" class=\"wp-image-143\" srcset=\"https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-48-1024x722.png 1024w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-48-300x211.png 300w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-48-768x541.png 768w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-48.png 1155w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Shinewater roundabout would be widened and have signals added on all arms. A toucan crossing would also be added on the southern arm.<\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Lottbridge Roundabout<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"722\" src=\"https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-49-1024x722.png\" alt=\"\" class=\"wp-image-144\" srcset=\"https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-49-1024x722.png 1024w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-49-300x212.png 300w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-49-768x542.png 768w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-49.png 1154w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Lottbridge roundabout would be widened and receive traffic signals on all arms. Toucan crossing would be added across the Northwestern arm, and partly Southwestern arm. <\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Birch Roundabout<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"720\" src=\"https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-50-1024x720.png\" alt=\"\" class=\"wp-image-145\" srcset=\"https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-50-1024x720.png 1024w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-50-300x211.png 300w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-50-768x540.png 768w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-50.png 1158w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Birch Roundabout would only get new Toucan crossings offset on two of the arms<\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Seaside Roundabout<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"719\" src=\"https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-51-1024x719.png\" alt=\"\" class=\"wp-image-146\" srcset=\"https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-51-1024x719.png 1024w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-51-300x211.png 300w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-51-768x539.png 768w, https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/image-51.png 1156w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>The current roundabout would be replaced by a traffic signal controlled crossroads. Toucan crossings would be provided across two of the arms, with Seaside getting an inline crossing as it is part of the NCN. Left turn bypasses would be provided in two directions, although one would also have a toucan crossing on it.<\/figcaption><\/figure>\n\n\n\n<div class=\"wp-block-file\"><a href=\"https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/A22_A2290_Brochure.pdf\">A22_A2290_Brochure<\/a><a href=\"https:\/\/sussex-transport.net\/wp-content\/uploads\/2021\/07\/A22_A2290_Brochure.pdf\" class=\"wp-block-file__button\" download>Download<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Between the 12th July and 20th August, ESCC are putting various improvements for the A22 &amp; A2290 to consultation. In total there are 9 junctions.<\/p>\n","protected":false},"author":1,"featured_media":148,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[40,7],"tags":[65,66,64,63,62],"class_list":["post-136","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-a22-hail","category-prn","tag-a22","tag-a2290","tag-eastbourne","tag-hailsham","tag-junction-improvments"],"_links":{"self":[{"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/posts\/136","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/comments?post=136"}],"version-history":[{"count":2,"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/posts\/136\/revisions"}],"predecessor-version":[{"id":171,"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/posts\/136\/revisions\/171"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/media\/148"}],"wp:attachment":[{"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/media?parent=136"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/categories?post=136"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/tags?post=136"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}