{"id":520,"date":"2021-10-06T08:00:00","date_gmt":"2021-10-06T08:00:00","guid":{"rendered":"https:\/\/sussex-transport.net\/?p=520"},"modified":"2021-10-05T21:14:47","modified_gmt":"2021-10-05T21:14:47","slug":"east-sussex-has-is-lcwip-approved","status":"publish","type":"post","link":"https:\/\/sussex-transport.net\/index.php\/2021\/10\/06\/east-sussex-has-is-lcwip-approved\/","title":{"rendered":"East Sussex has is LCWIP approved"},"content":{"rendered":"\n<p>On the 30th September East Sussex County Council&#8217;s Cabinet met to consider and then approved the LCWIP for the county. This now means that the LCWIP has formally been adopted and will be used in the future to safeguard and improve the current cycle provision.<\/p>\n\n\n\n<p>Unlike WSCC which is allowing the LCWIP to be produced on a district level, ESCC is producing its LCWIP on the county level, however it is split into 6 sub-sections which partly align with the districts. The plan doesn&#8217;t included what measures will be introduced as part of each scheme or the exact alignment of these routes, in addition the plan can change overtime.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.eastsussex.gov.uk\/media\/18763\/east-sussex-lcwip-summary-document-september-2021.docx\">https:\/\/www.eastsussex.gov.uk\/media\/18763\/east-sussex-lcwip-summary-document-september-2021.docx<\/a><\/p>\n\n\n\n<p>Routes of each section will be outlined in future posts, however the priority routes which already have funding or are due to be constructed in the next 10 years are below.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Eastbourne &amp; South Wealden Area<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Scheme Name<\/td><td>Scheme Type<\/td><td>Distance<\/td><td>Cost<\/td><td>Priority (Years)<\/td><\/tr><tr><td>Eastbourne Walking and<br>Cycle Network &#8211; Horsey Way<br>Phase 1B (Cavendish<br>Place to Ringwood Road)<\/td><td>Cycle Route<\/td><td>1.8km<\/td><td>1.3m<\/td><td>1-4<\/td><\/tr><tr><td>Eastbourne Walking and<br>Cycle Network &#8211; Langney<br>Rise cycle route<\/td><td> Cycle Route <\/td><td>1.6km<\/td><td>0.9m<\/td><td>1-4<\/td><\/tr><tr><td>Eastbourne Walking and<br>Cycle Network- Willingdon<br>Drove cycle route<\/td><td> Cycle Route <\/td><td>0.8km<\/td><td>0.35m<\/td><td>1-4<\/td><\/tr><tr><td>Eastbourne \/ South Wealden<br>cycling and walking<br>improvements &#8211; Stone CrossRoyal Parade via Langney<\/td><td> Cycle Route <\/td><td>3.5km<\/td><td>3.8m<\/td><td>1-4<\/td><\/tr><tr><td>Eastbourne \/ South Wealden<br>cycling and walking<br>improvements &#8211; Eastbourne<br>town<br>centre cycle routes<\/td><td> Cycle Route <\/td><td>1.3km<\/td><td>0.5m<\/td><td>1-4<\/td><\/tr><tr><td>Hailsham \u2013 Polegate \u2013<br>Eastbourne<br>Movement &amp; Access<br>Corridor Scheme (HPE MAC<br>\u2013 PHASE 2 Victoria Drive bus<br>lane<\/td><td>Multi Modal \u2013<br>Bus\/Cycle\/Pedestrian<br>improvements<\/td><td>Unknown<\/td><td>Unknown<\/td><td>4<\/td><\/tr><tr><td>HPE MAC \u2013 PHASE 3 Ersham<br>Road roundabout, Hailsham<\/td><td>Multi Modal \u2013<br>Bus\/Cycle\/Pedestrian<br>improvements<\/td><td>Unknown <\/td><td>Unknown  <\/td><td>4<\/td><\/tr><tr><td>Eastbourne Town Centre<br>(Liveable Towns)<br>Phase 2b: Terminus Road \u2013<br>Langney Road to Grand<br>Parade<\/td><td>Pedestrian\/Bus\/Cycling<br>improvements \u2013 reallocation of road space<\/td><td>5,500sqm<\/td><td>5.3m<br>6m<\/td><td>4<\/td><\/tr><tr><td>HPE MAC \u2013 PHASE 4 A2021<br>Kings Drive\/Rodmill<br>Roundabout<\/td><td>Multi Modal \u2013<br>Bus\/Cycle\/Pedestrian<br>improvements<\/td><td>Unknown<\/td><td>Unknown<\/td><td>4 &#8211; 10<\/td><\/tr><tr><td>Eastbourne Town Centre<br>(Liveable Towns)<br>Little Chelsea (Grove Road)<br>South Street corridor,<br>Memorial roundabout<br>pedestrian improvements<\/td><td>Pedestrian\/Bus\/Cycling<br>improvements \u2013 reallocation of road space<\/td><td>3,000<br>sqm<\/td><td>Memorial<br>Roundabout<br>\u00a31.8m<\/td><td>4 (Memorial)<br>10 (Little<br>Chelsea South<br>St)<\/td><\/tr><tr><td>Eastbourne Seafront Cycle<br>Route<\/td><td>Cycle Route<\/td><td>Unknown<\/td><td>2m<\/td><td>4 &#8211; 10<\/td><\/tr><tr><td>HPE MAC \u2013 PHASE 5 \u2013<br>Rodmill roundabout to town<br>centre<\/td><td>Multi Modal \u2013<br>Bus\/Cycle\/Pedestrian<br>improvements<\/td><td>Unknown<\/td><td>Unknown<\/td><td>10<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Newhaven Area<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td> Scheme Name<\/td><td>Scheme Type<\/td><td>Distance<\/td><td>Cost<\/td><td>Priority (Years)<\/td><\/tr><tr><td>Avis Road \u2013 Newhaven<\/td><td>Cycle Route\/Toucan<br>crossing\/bus stop<br>improvements<\/td><td>0.8km<\/td><td>0.5m<\/td><td>4<\/td><\/tr><tr><td>A259 \u2013 Newhaven \u2013<br>Pevensey<\/td><td>Multi Modal \u2013<br>Bus\/Cycle\/Pedestrian<br>improvements<\/td><td>Unknown<\/td><td>2m<\/td><td>4 &#8211; 10<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Hastings &amp; Bexhill Area<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Scheme Name<\/td><td>Scheme Type<\/td><td>Distance<\/td><td>Cost<\/td><td>Priority (Years)<\/td><\/tr><tr><td>Hastings Walking and Cycle<br>Network &#8211; Queensway to<br>Silverhill (western) route<\/td><td>Cycle Route<\/td><td>4.3km<\/td><td>0.5m<\/td><td>1<\/td><\/tr><tr><td>Hastings Movement &amp;<br>Access Route Schemes<br>(MARS) \u2013 Seafront<br>Connectivity<\/td><td>Pedestrian improvements<br>at junction and widened<br>footway<\/td><td>0.1km<\/td><td>0.8m<\/td><td>1<\/td><\/tr><tr><td>Hastings Movement &amp;<br>Access Route Schemes<br>(MARS) \u2013 Station to Seafront<\/td><td>Pedestrian improvement<br>and cycle parking<\/td><td>0.5km<\/td><td>1.1m<\/td><td>1<\/td><\/tr><tr><td>Bexhill Walking and Cycling<br>Network: Collington<br>Avenue\/Sutherland Avenue<br>junction pedestrian crossing<\/td><td>Pedestrian refuge scheme<\/td><td>&#8211;<\/td><td>0.1m<\/td><td>1<\/td><\/tr><tr><td>Bexhill Walking and Cycle<br>Network &#8211; Cycle Routes 1 &#8211; 9<br>(East &amp; North Bexhill)<\/td><td>Cycle Routes<\/td><td>6.3km<\/td><td>1.5m<\/td><td>1 &#8211; 4<\/td><\/tr><tr><td>Alexandra Park \u2013 Conquest<br>Hospital \u2013 Hastings<\/td><td>Cycle Route<\/td><td>5km<\/td><td>2m<\/td><td>4 &#8211; 10<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Lewes &amp; South Downs National Park Area<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Scheme Name<\/td><td>Scheme Type<\/td><td>Distance<\/td><td>Cost<\/td><td>Priority (Years)<\/td><\/tr><tr><td>Regional Route 90 &#8211; Lewes<\/td><td>Cycle Route<\/td><td>3.5km<\/td><td>1.8m<\/td><td>4 &#8211; 10<\/td><\/tr><tr><td>A27 \u2013 Falmer &#8211; Ashcombe<\/td><td>Shared cycling\/walking<br>route<\/td><td>Unknown<\/td><td>Unknown<\/td><td>4 &#8211; 10<\/td><\/tr><tr><td>Lewes Wayfinding<\/td><td>Pedestrian Improvement<\/td><td>Unknown<\/td><td>0.3m<\/td><td>4<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">County Wide Measures<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Scheme Name<\/td><td>Scheme Type<\/td><td>Distance<\/td><td>Cost<\/td><td>Priority (Years)<\/td><\/tr><tr><td>School Streets County Wide<br>Programme<\/td><td>Pedestrian\/cycling \u2013 reallocation of road space<\/td><td>&#8211;<\/td><td>0.5m<\/td><td>4<\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>On the 30th September East Sussex County Council&#8217;s Cabinet met to consider and then approved the LCWIP for the county. This now means that the<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13,154],"tags":[203,206],"class_list":["post-520","post","type-post","status-publish","format-standard","hentry","category-active","category-strategies-reports","tag-east-sussex","tag-lcwip"],"_links":{"self":[{"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/posts\/520","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/comments?post=520"}],"version-history":[{"count":1,"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/posts\/520\/revisions"}],"predecessor-version":[{"id":521,"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/posts\/520\/revisions\/521"}],"wp:attachment":[{"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/media?parent=520"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/categories?post=520"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sussex-transport.net\/index.php\/wp-json\/wp\/v2\/tags?post=520"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}