In a FOI request, B&H were asked about the timeline of delivery of their current road schemes, they are: Valley Gardens: Technical Design from January
Category: Old Town

A23 London Road (LCWIP 4) A259 Marine Parade (LCWIP 9) Active Travel Schemes Brighton & Hove Old Shoreham Road (LCWIP 12) Old Town Valley Gardens
Brighton and Hove’s potential Tranche 3 schemes
For the meeting of the 2nd Tranche Active Travel Fund’s post consultation debates, it was outlined what potential scheme could be bided for as part