In a FOI request, B&H were asked about the timeline of delivery of their current road schemes, they are: Valley Gardens: Technical Design from January
Category: Old Town
![Illustration of a potential stepped cycle lane along Old Shoreham Road (A270) besides Hove Park](https://sussex-transport.net/wp-content/uploads/2021/07/hove-park.png)
A23 London Road (LCWIP 4) A259 Marine Parade (LCWIP 9) Active Travel Schemes Brighton & Hove Old Shoreham Road (LCWIP 12) Old Town Valley Gardens
Brighton and Hove’s potential Tranche 3 schemes
For the meeting of the 2nd Tranche Active Travel Fund’s post consultation debates, it was outlined what potential scheme could be bided for as part