This month works started on Western Road which will see the whole corridor between the Clocktower and Montpelier Road rebuilt. The aims of the scheme
Category: Western Road (LCWIP 10)
![](https://sussex-transport.net/wp-content/uploads/2021/07/A259-Temp-Cycle-Lane.png)
A23 London Road (LCWIP 4) A259 Marine Parade (LCWIP 9) Active Travel Schemes Brighton & Hove NCN2 (A259 Seafront) (LCWIP 6) Old Town Valley Gardens Western Road (LCWIP 10)
Timeline of road schemes in Brighton & Hove
In a FOI request, B&H were asked about the timeline of delivery of their current road schemes, they are: Valley Gardens: Technical Design from January
![](https://sussex-transport.net/wp-content/uploads/2021/09/network-plan-for-cycle-improvements_0.png)
A23 London Road (LCWIP 4) A259 Marine Parade (LCWIP 9) Active Travel Schemes Brighton & Hove NCN2 (A259 Seafront) (LCWIP 6) Old Shoreham Road (LCWIP 12) Strategies & Reports Western Road (LCWIP 10)
Brighton & Hove’s draft LCWIP opened for consultation
On the 30th September 2021, Brighton & Hove City Council opened their draft Local Cycling & Walking Infrastructure Plan (LCWIP) for consultation, the consultation will
![](https://sussex-transport.net/wp-content/uploads/2021/09/image-17.png)
The active travel Western Road scheme is Brighton has had its TRO’s opened for comments. The Western Road scheme mostly includes changes to the realm
![](https://sussex-transport.net/wp-content/uploads/2021/07/Western-Road.png)
Plans to improve Western Road as part of the Active Travel Fund have been released. These changes are mostly for easier and safer pedestrian crossings