A second round of informal consultation has been held by Gatwick Airport Limited. This consultation is running between the 14th June till the 27th July
Category: Gatwick Airport Surface Access (A23/M23/A217)
![](https://sussex-transport.net/wp-content/uploads/2021/09/image-4.png)
As part of the expansion of Gatwick Airport which may increase passenger throughput by 20% by 2038, there are proposed change to the road network
On the 25th August, Gatwick Airport Limited (GAL) announced that a public consultation will begin on the 9th September and last for 9 weeks. The