The long overdue allocations of the Active Travel Fund Tranche 3 were announced last week. West Sussex, as expected was not awarded any money due
Category: A259 Marine Parade (LCWIP 9)
![](https://sussex-transport.net/wp-content/uploads/2021/07/A259-Temp-Cycle-Lane.png)
A23 London Road (LCWIP 4) A259 Marine Parade (LCWIP 9) Active Travel Schemes Brighton & Hove NCN2 (A259 Seafront) (LCWIP 6) Old Town Valley Gardens Western Road (LCWIP 10)
Timeline of road schemes in Brighton & Hove
In a FOI request, B&H were asked about the timeline of delivery of their current road schemes, they are: Valley Gardens: Technical Design from January
![](https://sussex-transport.net/wp-content/uploads/2021/09/network-plan-for-cycle-improvements_0.png)
A23 London Road (LCWIP 4) A259 Marine Parade (LCWIP 9) Active Travel Schemes Brighton & Hove NCN2 (A259 Seafront) (LCWIP 6) Old Shoreham Road (LCWIP 12) Strategies & Reports Western Road (LCWIP 10)
Brighton & Hove’s draft LCWIP opened for consultation
On the 30th September 2021, Brighton & Hove City Council opened their draft Local Cycling & Walking Infrastructure Plan (LCWIP) for consultation, the consultation will
![Illustration of a potential stepped cycle lane along Old Shoreham Road (A270) besides Hove Park](https://sussex-transport.net/wp-content/uploads/2021/07/hove-park.png)
A23 London Road (LCWIP 4) A259 Marine Parade (LCWIP 9) Active Travel Schemes Brighton & Hove Old Shoreham Road (LCWIP 12) Old Town Valley Gardens
Brighton and Hove’s potential Tranche 3 schemes
For the meeting of the 2nd Tranche Active Travel Fund’s post consultation debates, it was outlined what potential scheme could be bided for as part