Over the past two weeks two of the road schemes which were due to start imminently in Brighton & Hove have been postponed, with both
Category: Valley Gardens
Anything involving the A23 at Valley Gardens and the Old Steine
![](https://sussex-transport.net/wp-content/uploads/2023/01/Valley-Gardens-Phase-3-Render-2022.jpg)
The proposed 18-month project to redesign the public realm at the Old Stenie on the Southern end of the A23 in Brighton is reported to
![](https://sussex-transport.net/wp-content/uploads/2022/01/Aqua-After.png)
The proposed plan for Valley Gardens Phase 3 has been completely redesign upon consultation feedback in 2018. The new plan provides for a better continuous
The ETROs that were introduced when the Valley Gardens Phase 1 & 2 projects came to completion in September 2020 are coming up to their
![](https://sussex-transport.net/wp-content/uploads/2021/07/A259-Temp-Cycle-Lane.png)
Timeline of road schemes in Brighton & Hove
In a FOI request, B&H were asked about the timeline of delivery of their current road schemes, they are: Valley Gardens: Technical Design from January
![Illustration of a potential stepped cycle lane along Old Shoreham Road (A270) besides Hove Park](https://sussex-transport.net/wp-content/uploads/2021/07/hove-park.png)
Brighton and Hove’s potential Tranche 3 schemes
For the meeting of the 2nd Tranche Active Travel Fund’s post consultation debates, it was outlined what potential scheme could be bided for as part