Skip to content
  • Acronyms and Jargon
  • Privacy Policy

Sussex Transport Projects

Proposed, Constructed and Completed Transportation Projects in Sussex

  • Active Travel Schemes
    • Adur District
    • Arun District
      • Upper Shoreham Road & Old Shoreham Road (A270)
    • Brighton & Hove
      • A23 London Road (LCWIP 4)
      • A259 Marine Parade (LCWIP 9)
      • Hanover & Tarner Liveable Neighbourhood Pilot
      • Mini-Holland scheme
      • NCN2 (A259 Seafront) (LCWIP 6)
      • Old Shoreham Road (LCWIP 12)
      • Old Town
      • School Streets
      • Western Road (LCWIP 10)
    • Chichester District
      • A259 Chichester – Bognor Regis
      • NCN2 (A259) Chichester-Emsworth
      • Westgate
    • Crawley Borough
      • LCWIP Route A
      • LCWIP Route B
      • LCWIP Route N
      • Town Centre
    • Eastbourne
      • Horsey Way
      • Stone Cross – Seafront
    • Mid Sussex
      • Hassocks
    • Worthing District
      • A24 Findon Road
  • Gatwick Airport
  • Major Roads
    • A22 Hailsham & Eastbourne
    • A24 Horsham
    • A29 Woodgate
    • A259 Bognor to Littlehampton
    • A259 Exceat Bridge
    • A259 Littlehampton
    • A284 Lyminster Bypass
    • A2300
  • Minor Roads
    • Burgess Hill Northern Arc
    • Manor Royal
    • Newhaven Harbour Access
    • North Horsham
  • Public Realm changes
    • Eastern Gateway – Crawley
    • Valley Gardens
  • Railway
  • Strategies & Reports
  • Trunk Road
    • A27 Arundel
    • A27 Chichester
    • A27 Lancing
    • A27 Lewes to Polegate
    • A27 Worthing
    • Gatwick Airport Surface Access (A23/M23/A217)

Category: Public Realm changes

Everything that is a Public Realm scheme, this may include pedestrianisation of streets or landscape changes.

Public Realm changes Valley Gardens

Valley Gardens Phase 3 Scheme due to start construction in Spring 2023

6 January, 202326 January, 2023 Jervi

The proposed 18-month project to redesign the public realm at the Old Stenie on the Southern end of the A23 in Brighton is reported to

Read More
Active Travel Schemes Eastbourne Public Realm changes

Eastbourne town centre plans will introduced more pedestrian streets & relocated ring road.

3 November, 20222 November, 2022 Jervi

East Sussex County Council are currently consulting on changes in Eastbourne town centre which would improve the environment for pedestrians. The overall changes include: Terminus

Read More
A23 London Road (LCWIP 4) Active Travel Schemes Brighton & Hove Public Realm changes Valley Gardens

Revised plans for Valley Gardens Phase 3 will introduce a two-way CYCLOPS junction

13 January, 202212 January, 2022 Jervi

The proposed plan for Valley Gardens Phase 3 has been completely redesign upon consultation feedback in 2018. The new plan provides for a better continuous

Read More
Public Realm changes

Bexhill, London Road proposed public realm changes

16 November, 202115 November, 2021 Jervi

A public realm project has been put to consultation for London Road in Bexhill. There are two proposed options for the Memorial Gyratory, as well

Read More
Public Realm changes Valley Gardens

Valley Gardens TROs to be made permanent after 15 month consultation period

12 November, 202111 November, 2021 Jervi

The ETROs that were introduced when the Valley Gardens Phase 1 & 2 projects came to completion in September 2020 are coming up to their

Read More
A23 London Road (LCWIP 4) A259 Marine Parade (LCWIP 9) Active Travel Schemes Brighton & Hove NCN2 (A259 Seafront) (LCWIP 6) Old Town Valley Gardens Western Road (LCWIP 10)

Timeline of road schemes in Brighton & Hove

2 November, 20211 November, 2021 Jervi

In a FOI request, B&H were asked about the timeline of delivery of their current road schemes, they are: Valley Gardens: Technical Design from January

Read More
Active Travel Schemes Brighton & Hove Public Realm changes Western Road (LCWIP 10)

Western Road pedestrian improvements plans released.

23 July, 202117 September, 2021 Jervi

Plans to improve Western Road as part of the Active Travel Fund have been released. These changes are mostly for easier and safer pedestrian crossings

Read More
Render of road improvements on College Road, Crawley
Active Travel Schemes Crawley Borough Eastern Gateway - Crawley Public Realm changes Town Centre

Crawley’s Eastern Gateway Scheme Under construction

20 July, 202117 September, 2021 Jervi

Main construction works started on the 8th July on the Eastern Gateway Scheme. This scheme is mainly a public realm scheme, making the area along

Read More
Illustration of a potential stepped cycle lane along Old Shoreham Road (A270) besides Hove Park
A23 London Road (LCWIP 4) A259 Marine Parade (LCWIP 9) Active Travel Schemes Brighton & Hove Old Shoreham Road (LCWIP 12) Old Town Valley Gardens

Brighton and Hove’s potential Tranche 3 schemes

15 July, 202117 September, 2021 Jervi

For the meeting of the 2nd Tranche Active Travel Fund’s post consultation debates, it was outlined what potential scheme could be bided for as part

Read More

Recent Posts

  • Bike Hire Scheme relaunching in April
  • Improvement to A259 junctions between Littlehampton and Bognor in final consultation
  • A24 Findon Cycleway opens
  • Consultation on footpath upgrade to cycleway opens for Bognor Regis
  • A27 Worthing & Lancing improvement program scaled down as an interim solution

Archives

  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021

Categories

All Rights Reserved 2021.
Proudly powered by WordPress | Theme: Fairy by Candid Themes.
Cleantalk Pixel
Manage Cookie Consent
We use cookies to optimize our website and our service.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage vendors Read more about these purposes
Preferences
{title} {title} {title}