The final section of Horsey Way Cycleway in Eastbourne has been opened for consultation, and the plans in general are lacking in provisions for cyclists
![](https://sussex-transport.net/wp-content/uploads/2021/08/Eastbourne-Routes-Overview-2021-06-11-General.png)
Eastbourne have released plans to the public for consultation on 5 new cycle routes within the Town. Funding for these routes have already been secured
![](https://sussex-transport.net/wp-content/uploads/2021/08/geograph-3218082-by-Roger-A-Smith.jpg)
As part of the Governments latest efforts to encourage sustainable transport and active travel for short journeys there is an opportunity for 12 areas in
![](https://sussex-transport.net/wp-content/uploads/2021/08/image-5.png)
The Draft West Sussex Transport Plan (2022-2036) outlines the current transport networks within West Sussex and the potential aspirations for future changes and needs. Every
![](https://sussex-transport.net/wp-content/uploads/2021/08/image-4.png)
The Draft West Sussex Transport Plan (2022-2036) outlines the current transport networks within West Sussex and the potential aspirations for future changes and needs. Every
![Old Shoreham Road Temp Cycle Lane at Junction](https://sussex-transport.net/wp-content/uploads/2021/08/OSR-Temp-lane.png)
During the urgency sub committee in relation to the Old Shoreham Road, councillors voted to remove the temporary cycle lane on OSR and not to
![Illustration of a potential stepped cycle lane along Old Shoreham Road (A270) besides Hove Park](https://sussex-transport.net/wp-content/uploads/2021/07/hove-park.png)
As part of the previous council meeting on the 21st July 2021, the council voted to remove the current Old Shoreham Road Temporary Cycle Lanes
![](https://sussex-transport.net/wp-content/uploads/2021/08/image-1.png)
Tomorrow the TRO response period to establish 4 new crossings on Rusper Road & School Road will open. Both of these roads are new or
![](https://sussex-transport.net/wp-content/uploads/2021/08/geograph-3123998-by-Colin-Pyle.jpg)
WSCC are carrying out some improvements to the A272 around Easeboune and Lodsworth. This makes up the second phase of improvements to the A272 and
![](https://sussex-transport.net/wp-content/uploads/2021/07/image-65.png)
Worthing and Adur district councils are planning on rolling out their own bike hire scheme, which is likely to operate as an extension of the