As part of the previous council meeting on the 21st July 2021, the council voted to remove the current Old Shoreham Road Temporary Cycle Lanes
Category: Active Travel Schemes
Everything that is an active travel centred project, usually funded by the “Active Travel Fund”
![](https://sussex-transport.net/wp-content/uploads/2021/07/image-65.png)
Worthing and Adur district councils are planning on rolling out their own bike hire scheme, which is likely to operate as an extension of the
![](https://sussex-transport.net/wp-content/uploads/2021/07/image-66.png)
Similar to the proposed Dutch Roundabout, there are proposed changes along Sherbourne road which are to be carried out by the housing developer on the
![](https://sussex-transport.net/wp-content/uploads/2021/07/geograph-1977912-by-Paul-Gillett.jpg)
West Sussex “School” Active Travel Improvements plans & consultation
Between the 19th July and 15th August, WSCC are putting plans for active travel to consultation. This makes up several small schemes across the county
![](https://sussex-transport.net/wp-content/uploads/2021/07/image-63.png)
As part of the highway works for new housing development on the Western side of Chichester, the developer proposing the changes to Westgate roundabout and
![](https://sussex-transport.net/wp-content/uploads/2021/07/Western-Road.png)
Plans to improve Western Road as part of the Active Travel Fund have been released. These changes are mostly for easier and safer pedestrian crossings
![](https://sussex-transport.net/wp-content/uploads/2021/07/Southbourne_–_Nutbourne.jpg)
On the 22nd July 2021 the consultation on improvements to NCN2 between Chichester and Emsworth were put to the public. This project is due to
![B&HCC Meeting July 2021](https://sussex-transport.net/wp-content/uploads/2021/07/meeting.png)
During the Council’s Special meeting on Environment, Transport and Sustainability, Labour’s and Conservatives’ amendments were voted in favour which will likely result in the Old
![Render of road improvements on College Road, Crawley](https://sussex-transport.net/wp-content/uploads/2021/07/Eastern-Gateway.png)
Main construction works started on the 8th July on the Eastern Gateway Scheme. This scheme is mainly a public realm scheme, making the area along
![Findon Valley Active Travel Scheme Drawing](https://sussex-transport.net/wp-content/uploads/2021/07/image.png)
On Monday the 19th July 2021 West Sussex announced their plans for consultation for a 2km new shared cycle and footway on the eastern side