Over the past two weeks two of the road schemes which were due to start imminently in Brighton & Hove have been postponed, with both
Category: Valley Gardens
Anything involving the A23 at Valley Gardens and the Old Steine

The proposed 18-month project to redesign the public realm at the Old Stenie on the Southern end of the A23 in Brighton is reported to

The proposed plan for Valley Gardens Phase 3 has been completely redesign upon consultation feedback in 2018. The new plan provides for a better continuous
The ETROs that were introduced when the Valley Gardens Phase 1 & 2 projects came to completion in September 2020 are coming up to their

Timeline of road schemes in Brighton & Hove
In a FOI request, B&H were asked about the timeline of delivery of their current road schemes, they are: Valley Gardens: Technical Design from January

Brighton and Hove’s potential Tranche 3 schemes
For the meeting of the 2nd Tranche Active Travel Fund’s post consultation debates, it was outlined what potential scheme could be bided for as part