Skip to content
  • Acronyms and Jargon
  • Privacy Policy

Sussex Transport Projects

Proposed, Constructed and Completed Transportation Projects in Sussex

  • Active Travel Schemes
    • Adur District
    • Arun District
      • Upper Shoreham Road & Old Shoreham Road (A270)
    • Brighton & Hove
      • A23 London Road (LCWIP 4)
      • A259 Marine Parade (LCWIP 9)
      • Hanover & Tarner Liveable Neighbourhood Pilot
      • Mini-Holland scheme
      • NCN2 (A259 Seafront) (LCWIP 6)
      • Old Shoreham Road (LCWIP 12)
      • Old Town
      • School Streets
      • Western Road (LCWIP 10)
    • Chichester District
      • A259 Chichester – Bognor Regis
      • NCN2 (A259) Chichester-Emsworth
      • Westgate
    • Crawley Borough
      • LCWIP Route A
      • LCWIP Route B
      • LCWIP Route N
      • Town Centre
    • Eastbourne
      • Horsey Way
      • Stone Cross – Seafront
    • Mid Sussex
      • Hassocks
    • Worthing District
      • A24 Findon Road
  • Gatwick Airport
  • Major Roads
    • A22 Hailsham & Eastbourne
    • A24 Horsham
    • A29 Woodgate
    • A259 Bognor to Littlehampton
    • A259 Exceat Bridge
    • A259 Littlehampton
    • A284 Lyminster Bypass
    • A2300
  • Minor Roads
    • Burgess Hill Northern Arc
    • Manor Royal
    • Newhaven Harbour Access
    • North Horsham
  • Public Realm changes
    • Eastern Gateway – Crawley
    • Valley Gardens
  • Railway
  • Strategies & Reports
  • Trunk Road
    • A27 Arundel
    • A27 Chichester
    • A27 Lancing
    • A27 Lewes to Polegate
    • A27 Worthing
    • Gatwick Airport Surface Access (A23/M23/A217)

Author: Jervi

Gatwick Airport

Proposed Northern Runway Works for Gatwick Airport expansion

9 September, 202117 September, 2021 Jervi

Today (9th September 2021), Gatwick Airport Limited (GAL) opened the consultation for the works to take place at Gatwick Airport to allow the emergency runway

Read More
A24 Horsham Major Roads

Robin Hood Roundabout main works completed

7 September, 202117 September, 2021 Jervi

On the 1st September the traffic signals at Robin Hood Roundabout on the A24 at Horsham were turned on. The roundabout has been under reconstruction

Read More
Active Travel Schemes Crawley Borough LCWIP Route B

Crawley’s “Route B” potential cycling & walking improvements

6 September, 202117 September, 2021 Jervi

Update 9th September – It has come to my attention that a revised Crawley LCWIP was released in May 2021 which follows the same routes,

Read More
Strategies & Reports

Chichester District Transport Strategy (2022 – 2036)

3 September, 202117 September, 2021 Jervi

The Draft West Sussex Transport Plan (2022-2036) outlines the current transport networks within West Sussex and the potential aspirations for future changes and needs. Every

Read More
Minor Roads

Two sets of traffic signals to be refurbished

2 September, 202117 September, 2021 Jervi

Two sets of traffic signals in West Sussex are due to be replaced with newer equipment as the existing signals are at the end of

Read More
Active Travel Schemes Crawley Borough LCWIP Route A

Crawley’s “Route A” potential cycling & walking improvements

31 August, 202117 September, 2021 Jervi

Update 9th September – It has come to my attention that a revised Crawley LCWIP was released in May 2021 which follows the same routes,

Read More
Gatwick Airport Gatwick Airport Surface Access (A23/M23/A217)

Consultation announced for Gatwick’s Northern runway

26 August, 202117 September, 2021 Jervi

On the 25th August, Gatwick Airport Limited (GAL) announced that a public consultation will begin on the 9th September and last for 9 weeks. The

Read More
Strategies & Reports

Brighton & Hove to start using CCTV enforcement of cycle lanes

25 August, 202117 September, 2021 Jervi

On the 25th August, Brighton & Hove City Council announced that they would introduce cameras to enforce parking and/or loading restrictions of cycle lanes. Initially

Read More
A27 Chichester A27 Lewes to Polegate Strategies & Reports Trunk Road

£40 billion to be spent on new/improved trunk roads in the next 10 years

23 August, 202117 September, 2021 Jervi

A total of £40,000,000,000 of new and improved work opportunities are expected to be opened for tender of the next 10 years. Most of these

Read More
Active Travel Schemes Eastbourne Stone Cross - Seafront

Stone Cross to the Seafront cycle route plans published

20 August, 202117 September, 2021 Jervi

A new 5.5km cycle route between Stone Cross near Eastbourne and the seafront where it will join NCN21 has been opened for consultation. This is

Read More

Posts navigation

Previous 1 … 9 10 11 … 13 Next

Recent Posts

  • Bike Hire Scheme relaunching in April
  • Improvement to A259 junctions between Littlehampton and Bognor in final consultation
  • A24 Findon Cycleway opens
  • Consultation on footpath upgrade to cycleway opens for Bognor Regis
  • A27 Worthing & Lancing improvement program scaled down as an interim solution

Archives

  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021

Categories

All Rights Reserved 2021.
Proudly powered by WordPress | Theme: Fairy by Candid Themes.
Cleantalk Pixel
Manage Cookie Consent
We use cookies to optimize our website and our service.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage vendors Read more about these purposes
Preferences
{title} {title} {title}