The 2.5KM path running besides Falmer Road B2123 has been fully widened and resurfaced with black top. The works started in March 2021 to replace
Category: Brighton & Hove
![Old Shoreham Road Temp Cycle Lane at Junction](https://sussex-transport.net/wp-content/uploads/2021/08/OSR-Temp-lane.png)
On the 10th August the urgency sub committee decided to remove the temporary cycle lanes along Old Shoreham Road, and works to carry this out starts
![](https://sussex-transport.net/wp-content/uploads/2021/08/geograph-3218082-by-Roger-A-Smith.jpg)
As part of the Governments latest efforts to encourage sustainable transport and active travel for short journeys there is an opportunity for 12 areas in
![Old Shoreham Road Temp Cycle Lane at Junction](https://sussex-transport.net/wp-content/uploads/2021/08/OSR-Temp-lane.png)
During the urgency sub committee in relation to the Old Shoreham Road, councillors voted to remove the temporary cycle lane on OSR and not to
![Illustration of a potential stepped cycle lane along Old Shoreham Road (A270) besides Hove Park](https://sussex-transport.net/wp-content/uploads/2021/07/hove-park.png)
As part of the previous council meeting on the 21st July 2021, the council voted to remove the current Old Shoreham Road Temporary Cycle Lanes
![](https://sussex-transport.net/wp-content/uploads/2021/07/Western-Road.png)
Plans to improve Western Road as part of the Active Travel Fund have been released. These changes are mostly for easier and safer pedestrian crossings
![B&HCC Meeting July 2021](https://sussex-transport.net/wp-content/uploads/2021/07/meeting.png)
During the Council’s Special meeting on Environment, Transport and Sustainability, Labour’s and Conservatives’ amendments were voted in favour which will likely result in the Old
![](https://sussex-transport.net/wp-content/uploads/2021/07/A259-Temp-Cycle-Lane.png)
B&HCC have released the general plans for the westbound on-carriageway cycle lane expansion between Hove Lawns where the current temporary cycle lane ends, to Wharf
![Illustration of a potential stepped cycle lane along Old Shoreham Road (A270) besides Hove Park](https://sussex-transport.net/wp-content/uploads/2021/07/hove-park.png)
Brighton and Hove’s potential Tranche 3 schemes
For the meeting of the 2nd Tranche Active Travel Fund’s post consultation debates, it was outlined what potential scheme could be bided for as part
![A23 at Preston Drove Junction](https://sussex-transport.net/wp-content/uploads/2021/07/geograph-4284242-by-Basher-Eyre.jpg)
Plans for the Active Travel Fund Tranche 2 scheme to provided segregated and improved cycle infrastructure have been published by Brighton & Hove City Council