The shared cycle/footway besides Ditchling Road from Old Boat Corner to the edge of the built up area at Woodbourne Avenue is due to be
Category: Active Travel Schemes
Everything that is an active travel centred project, usually funded by the “Active Travel Fund”

The proposed plan for Valley Gardens Phase 3 has been completely redesign upon consultation feedback in 2018. The new plan provides for a better continuous

It is proposed that at the next Brighton & Hove Council meeting on the 16th December that a report will be requested for a future

Consultation on a new 2km cycle track running besides the A24 was ran this summer, and on the 8th December 2021 the report detailing the

Further Consultation has been carried out on the proposed extension of the temporary A259 cycle lane beside Brighton’s seafront. Initial consultation took place earlier this

Burgess Hill currently has several small highway schemes taking place, mostly aimed at sustainable transport. This mostly includes improving paths and roads around the town

East Sussex County Council are consulting on a new cycle route through Bexhill which would link the new development (the gateway) to the Seafront (NCN

Detailed designs for the A23 cycle track upgrade between Argyle Road & Cumberland Road have been released for comment. The other sections will have their

The Active Travel Fund 2 scheme which is planned to upgrade the existing cycle lanes along the A23 to stepped or segregated cycle tracks will
On the 16th November the Environmental Transport & Sustainability Committee met to discuss various items relating to Transport within the City. The Making the A259