On the 16th November the Environmental Transport & Sustainability Committee met to discuss various items relating to Transport within the City. The Making the A259
A public realm project has been put to consultation for London Road in Bexhill. There are two proposed options for the Memorial Gyratory, as well
The ETROs that were introduced when the Valley Gardens Phase 1 & 2 projects came to completion in September 2020 are coming up to their
East Sussex County Council are currently consulting on a speed limit reduction on Polegate High Street to 20mph from the current 30mph as well as
The Temporary Covid pop-up cycle lane along the A259 has been operating under a temporary ETRO which is valid for 18 months from its creation.
West Sussex County Council has announced the largest EV chargepoint deployment by any Local Authority in the Country. Connected Kerb has been appointed by the
The A259 Exceat Bridge in near Seaford, East Sussex has had nearly £8m secured from the Government’s Levelling Up Fund. The current bridge was built
The proposed RIS3 A27 scheme for a new off-line route between Lewes & Polegate has been added to the pipeline webpage. In addition to this,
West Sussex County Council approved and adopted the BSIP which will replace WSCC Bus Strategy that was previously adopted in 2018. This BSIP outlines targets
Timeline of road schemes in Brighton & Hove
In a FOI request, B&H were asked about the timeline of delivery of their current road schemes, they are: Valley Gardens: Technical Design from January