The proposed plan for Valley Gardens Phase 3 has been completely redesign upon consultation feedback in 2018. The new plan provides for a better continuous
Author: Jervi
Between the 11th January and 8th March 2022 National Highways are wanting feedback & comments on their statutory consultation. The route alignment was previously announced
In the early 2000s West Sussex County Council began to look into options for closing all gaps on the A24 dual carriageway between Southwater &
At the end of August 2021 Brighton & Hove City Council announced that they would start using camera enforcement of cycle lanes to issue PCNs
Planning application DM/21/4355 outlines the works to be taken place for the new traffic signal controlled crossroads on Issacs’ Lane & Northern Arc Avenue, as
The Fitzaland Link Road between East Street (B2187) & Worthing Road (A259) has now been opened to all traffic ahead of the opening of the
It is proposed that at the next Brighton & Hove Council meeting on the 16th December that a report will be requested for a future
Consultation on a new 2km cycle track running besides the A24 was ran this summer, and on the 8th December 2021 the report detailing the
Further Consultation has been carried out on the proposed extension of the temporary A259 cycle lane beside Brighton’s seafront. Initial consultation took place earlier this
Burgess Hill currently has several small highway schemes taking place, mostly aimed at sustainable transport. This mostly includes improving paths and roads around the town