On the 1st September the traffic signals at Robin Hood Roundabout on the A24 at Horsham were turned on. The roundabout has been under reconstruction
Author: Jervi

Update 9th September – It has come to my attention that a revised Crawley LCWIP was released in May 2021 which follows the same routes,
The Draft West Sussex Transport Plan (2022-2036) outlines the current transport networks within West Sussex and the potential aspirations for future changes and needs. Every

Two sets of traffic signals in West Sussex are due to be replaced with newer equipment as the existing signals are at the end of

Update 9th September – It has come to my attention that a revised Crawley LCWIP was released in May 2021 which follows the same routes,
On the 25th August, Gatwick Airport Limited (GAL) announced that a public consultation will begin on the 9th September and last for 9 weeks. The

On the 25th August, Brighton & Hove City Council announced that they would introduce cameras to enforce parking and/or loading restrictions of cycle lanes. Initially

A total of £40,000,000,000 of new and improved work opportunities are expected to be opened for tender of the next 10 years. Most of these

A new 5.5km cycle route between Stone Cross near Eastbourne and the seafront where it will join NCN21 has been opened for consultation. This is

The currently signed cycle route between the Railway station and seafront is proposed to get some physical adjustments to make the cycle route better. Unfortunately